2020

by RustonHouse • | | 0 comments
Today saw the first step in the installation of the long awaited log cabin. Piles were driven 6ft into the ground. They were topped with paving slabs and then the base frames were bolted together and levelled. The job was really quite quick. This photo was taken just after 15:00 and the tea... read more
New Post
feeds Feeds